From Concept to Completion
Walk through the process of designing a solution. You’ll see a straightforward approach to narrow down your product options, and considerations to accommodate your unique needs.
See how the design concept from the first video comes together, as we begin assembling the cabinet. Let’s take those ideas and product recommendations and put them into action.
Get additional tips to help with your assembly and learn about accessories to tailor the cabinet to your needs. You'll also see the finished cabinet in action.
Download FREE
Drawing Files & Bill of Materials!
Popular XDIY Projects
IMPORTANT SAFETY INSTRUCTIONS Your safety and the safety of others are very important. Read instructions thoroughly prior to assembly. Please follow assembly instructions. Check for all parts before beginning assembly using the provided parts list to verify that all parts required to assemble the product are included. This kit contains parts that can be damaged if assembled incorrectly or in the wrong sequence. 80/20 shall not be responsible for replacing parts lost or damaged due to incorrect assembly. [Assistance is required during parts of the assembly].
80/20 QUALITY POLICY 80/20 is dedicated to providing its products free of actual defects in material and workmanship. 80/20 will replace or repair, at 80/20’s option, any product which, upon 80/20’s inspection is found to have a defect in material and/or workmanship provided such defect is reported to 80/20 in writing within one (1) year of the date of shipment from 80/20’s factory (“Quality Policy”). This Quality Policy does not cover failures due to abuse, accidental damages, or when repairs have been made or attempted by anyone other than 80/20. Should replacement of the defective items be unavailable, 80/20 reserves the right to substitute items of 80/20’s choice with items of similar style, color and quality. The terms of this Quality Policy are subject to change without notice. This Quality Policy is subject to the limitations set forth above. In addition, this Quality Policy is made to the original purchaser only and is effective only if items are purchased from 80/20 or one of 80/20’s authorized distributors. 80/20’s obligations under the Quality Policy is non-transferrable.
80/20 LIMITED WARRANTY All 80/20 products are guaranteed to be free of actual defects in material and workmanship, provided any such defect be reported to 80/20 in writing within one (1) year of date of purchase. This warranty is limited to replacing or repairing, at 80/20's option any part which, upon 80/20 inspection is found to have a defect in material and/or workmanship.
DISCLAIMER OF IMPLIED WARRANTIES No warranty is made by 80/20, express or implied, that 80/20 products as used in a customer’s design and specifications are fit for that customer’s specific purpose. APART FROM THE ABOVE QUALITY POLICY, THERE ARE NO WARRANTIES, EXPRESS, IMPLIED, OR STATUTORY, INCLUDING, WITHOUT LIMITATION, WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE, WHICH EXTEND BEYOND THE DESCRIPTION ON THE FACE HEREOF.
LIMITATION OF REMEDIES YOUR SOLE AND EXCLUSIVE REMEDY UNDER THIS QUALITY POLICY SHALL BE PRODUCT REPAIR OR REPLACEMENT AS PROVIDED HEREIN. 80/20 SHALL NOT BE LIABLE FOR SPECIFIC, INCIDENTAL OR CONSEQUENTIAL DAMAGES ARISING OUT OF THE USE OF 80/20 PRODUCTS. This quality policy provides customer with specific legal rights, and customer may have other rights which may vary according to relevant state laws.
MAINTENANCE Regularly check fastener hardware for tightness.
CONTACT INFORMATION For assistance in the U.S.A, call 1-260-248-8030. If you need further assistance, you can write 80/20 Inc. with any questions or comments at 1701 South 400 East, Columbia City, IN 46725 Visit us on the web at www.8020.net